Project update: March 2026
- This is the updated Programme Document.
- This is the community newsletter to provide a project update.
- This is a map showing how the solar areas have changed over time.
- These maps show the resulting ‘developable area’ which includes all of the above-ground infrastructure.
- These are the updated masterplans for Whitestone 1, Whitestone 2, Whitestone 3 and the whole project.
- This is the updated Programme Document.
- This is the leaflet for the targeted consultation from 4 March – 3 April 2026.
Project update: November 2025
- This is the updated Programme Document.
Second Consultation September – October 2025
- This is the leaflet to announce the consultation.
- This is the Statement of Community Consultation which explains how we plan to consult with the community.
- The exhibition boards from the public information events.
- Consultation booklet for
- Illustrative Masterplans include:
- Updated illustrative masterplans for
- Construction illustrative masterplans for
- The Draft ES includes:
- the Non Technical Summary
- the Non Technical Summary Appendix 1 Figures
- the full document is available in the toggles below
Project update: August 2025
- This is the Programme Document.
Project update: March 2025
- These are the updated masterplans for Whitestone 1, Whitestone 2 and Whitestone 3.
- This is a community update newsletter for Whitestone 1, Whitestone 2 and Whitestone 3.
First Consultation (Non-statutory): November 2024 – January 2025
- Booklet– This is the consultation booklet to explain our proposals.
- Questionnaire – The questionnaire is available in a digital or print version.
- Masterplan – These are the draft masterplans for Whitestone 1, Whitestone 2 and Whitestone 3.
Launch
- Leaflet – This is a short leaflet to introduce the project.
- Project location map – This map shows the area we are considering for Whitestone.